SUBOR has provided pipes for Medna Hydroelectric Power Plant Project in Bosnia Herzegovina.
Construction of the project started in 2014 and the supply of 2,500 meters of GRP pipes within DN 2600 mm - DN 2800 mm diameter and PN6 Bar pressure class was realized. Introduced by the Ministry in 2018, the power plant is expected to produce 21 GW of electricity a year and contribute to the quality of electricity producers’ electricity supply.